Edmonton City Hall 4.96

4.4 star(s) from 98 votes
1 Sir Winston Churchill Square
Edmonton, AB T5J 2R7
Canada

About Edmonton City Hall

Edmonton City Hall Edmonton City Hall is a well known place listed as Landmark in Edmonton , City Hall in Edmonton ,

Contact Details & Working Hours

Details

Edmonton's City Hall is the home of the municipal government of Edmonton, Alberta, Canada. Designed by Dub Architects, the building was completed in 1992. It was built to replace the former city hall after it had become outdated and expensive to operate.The Edmonton Transit System Customer Services centre relocated to City Hall in February 2013.DesignThe building features two steel and glass pyramids, one 43 metres high (ground to peak), on top of a three-storey concrete structure. One pyramid provides natural light for the main atrium, the other for the council chambers. The building also features a 200-foot clock Friendship Tower topped with a 23 carillon bells. Located on the eastern edge of the financial district in Edmonton's downtown, the building is the main feature on Sir Winston Churchill Square. In the winter, the fountain is converted to a skating rink.The design for the city hall met with some controversy when it was first announced. The original design called for the building to be topped with four cones. The cones were meant to pay tribute to the tipis that the First Nations once lived in on the site. The design met with negative feedback from the public as they felt it looked like dunce caps and nuclear reactors. Dub Architects then revised their design to replace the cones with the pyramids, with the pyramids designed to be evocative of the Rocky Mountains. The design was received much more warmly by the public, and was dubbed "Pyramid Power" by the press.